Everything is Included...
The most complete factory package available!
This Job Ready Package can be customized by one of our factory consultants for your specific needs. A Complete Package One Price.
Existing Boiler Job Ready Package
50’ From Furnace to Home
Plus 50’ Inside Home
Factory Pre-Plumbing Saves You 4 to 6 Hours
- 1 - 6' x 6' Geotextile Ground Cover
- 4 -12x12x1 Foot Pads
- 1 - Standard Back of Furnace w/011 pump
- 1 - TACO 011 Circulator Pump (for up to 50')
- 1 - 1" Threaded flanges for circulator (set)
- 2 - 1" Brass Full Port Ball Valves (threaded)
- 2 - 1" PEX x 1" Male Adapter fittings
- 2 - 1" PEX Crimp Rings
- 1 - 1" Brass x 2" Nipple
- 2 - 1" Brass 45 Ell
- 1 - 1" Brass Cap
- 1 - 1" Brass Plug
- 1 - 1" Brass 90 Ell
- 4 - 1" Brass x Close Nipple
- 1 - 3/4" Bronze Boiler Drain
- 1 - 3/4" x 3/4" Hose Swivel Adapter
- 2 - Rubber Washer
Between The Home and The Furnace (Underground)

(Enough material to set the furnace 50' from the home. Additional distance is available.)
- 100' - 1" High temperature flexible PEX pipe (cross-linked polyethylene)
- 7 - 8' MAXX-R polyethylene closed-cell foam insulation pieces (56' distance)
- 6 - MAXX-R Joint Connector Boots
- 2 - MAXX-R Protective End Cap Boot
- 12 - Joint Boot Ties
- 6' - 1 1/8" ID x 1" wall Transition Insulation
Inside The Home

- 50' - 1" High temperature flexible PEX pipe (cross-linked polyethylene)
- 54' - 1-1/8" ID x 1/2" wall closed-cell insulation (to cover the pipes inside/under the home)
- 1 - Roll of 2" wide closed cell insulation tape (to join the insulation)
- 10 - 1" PEX x 1" PEX Brass elbows
- 2 - 1" PEX couplings
- 24 - 1" PEX Crimp Rings
1 - Inline Air Removal Drain Kit

This little package allows you to use your home's water supply to purge the hydronic system of air.
- 1 - 3/4" x 3/4" Hose Swivel Adapter
- 2 - Rubber Washer
- 1 - 3/4" Bronze Boiler Drain
- 1 - 1" x 1" x 3/4" Threaded Brass Tee
- 2 - 1" PEX x 1" Male Adapter fittings
- 2 -1" PEX Crimp Rings
- 1 - Labor to assemble and test
Existing Boiler
(Illustration)
Water-To-Water Heat Plate Exchanger

- 1 - 225,000 BTU - 44 Plate Stainless Steel Water-To-Water Heat Exchanger
- 1 - Stainless Steel Flat Plate Heat Exchanger Assembly self install kit including:
- 2 - 1" WROT FRG x M Adapter
- 2 - 1" WROT FRG x STR LT 90 EII
- 2 - 1" WROT CxC Union
- 2 - 1" WROT FTG x FIP Adapter
- 2 - 1" Brz 400# Thrd Ball Valve
- 2 - 1" PEX Barb x 1" MPT Adapter
- 2 - 1" PEX Crimp Ring
- 1 - Industry Leading Installation Manual
Maintain Your CrossFire™

Included FREE with purchase of package
Protect your investment and maintain your warranty by correctly treating the water in your furnace.
Wood Burning Furnace Water Treatment Kit includes:
- 1 gallon of Certified Laboratories “Outdoor Furnace Water Treatment” chemical (treats up to 300 gallons).
- 4 sample bottles for treated furnace water.
- 4 shipping containers, labels and instructions for treated water sample bottles.
- 4 furnace water analyses and reports produced by Certified Laboratories.
- Instructions and procedure sheet.
Note: This material list is subject to change and is given for general reference only.
© Copyright 2001-2008 Timber Ridge, Inc. | All Rights Reserved